EU

amp-geo layout="nodisplay" You must add the attribute data-block-on-consent to any existing amp-ad components on the page as indicated below:

Thursday, September 3, 2015

New Hydro Power Plant in the Offing

New Hydro Power Plant in the Offing: "The Ministry of Natural Resources, Energy and Mining says it is conducting a feasibility study for construction of a new hydro power plant on the Shire River to enhance power supply to the national grid.
This comes at the back of challenges facing the existing hydro power plants on the Shire River owing to low water levels in Lake Malawi and silt in the river resulting from unprecedented environmental degradation."



'via Blog this'

No comments: