EU

amp-geo layout="nodisplay" You must add the attribute data-block-on-consent to any existing amp-ad components on the page as indicated below:

Saturday, March 30, 2013

www.esi-africa.com | Plans for 120 MW coal fired power station in Malawi

www.esi-africa.com | Plans for 120 MW coal fired power station in Malawi: "Plans for 120 MW coal fired power station in Malawi


28 March 2013 - Australian coal resources development company Intra Energy Corporation (IEC) has signed a memorandum of understanding (MoU) with Malawi’s government for the construction and operation of a 120 MW coal fired power station. The company is in the pre-feasibility stage of developing a minimum 120 MW power station at Chipoka, Malawi by no later than the end of 2016. The project would include the design, engineering, construction, operation and maintenance of the power plant and its ancillary infrastructure and IEC is considering potential expansion to 200 MW (net) or doubling capacity with a second plant of 120 MW."

'via Blog this'

No comments: